Home › Concrete driveway cost
How much does a concrete driveway cost in the Pittsburgh area? (2026)
A new concrete driveway in the Pittsburgh area (Allegheny, Washington, Westmoreland, Butler and Beaver counties) costs about $7.92–$10.10 per square foot installed with a standard broom finish. A typical 20 × 24 ft concrete driveway (480 sq ft) runs about $3,800–$4,850. Replacing an existing one, including removal and hauling, is about $5,700–$7,250, and a stamped finish is about $8,000–$10,200.
Prices updated 2026-11. Ranges include concrete, gravel base, forms, reinforcement, labor and a typical contractor margin. How we estimate.
Get a price for your concrete driveway
Concrete driveway cost by size
| Size | Sq ft | New pour broom | Replace old broom | New pour stamped | |
|---|---|---|---|---|---|
| 12 × 20 ft 1-car, short | 240 | $2,150–$2,700 | $3,100–$3,900 | $4,250–$5,400 | Details |
| 12 × 40 ft 1-car, long | 480 | $3,850–$4,900 | $5,700–$7,300 | $8,100–$10,350 | Details |
| 20 × 20 ft 2-car, short | 400 | $3,200–$4,050 | $4,750–$6,050 | $6,700–$8,550 | Details |
| 20 × 24 ft 2-car, standard | 480 | $3,800–$4,850 | $5,700–$7,250 | $8,000–$10,200 | Details |
| 24 × 40 ft 2-car, long | 960 | $7,150–$9,100 | $10,950–$13,900 | $15,700–$20,000 | Details |
What changes the price
- Removing old concrete adds breaking, hauling and dump fees: about $2,150 on a 20 × 24 ft job.
- Stamped or decorative finish adds about $4,800 on the same size.
- Thickness: each extra inch adds roughly 25% more concrete.
- Access: if the truck can't reach, a pump adds about $845.
- Small jobs: pours under 5 cubic yards often carry a short-load fee from the concrete plant.
- Site conditions: slope, poor soil, rock and drainage work are priced by the contractor after a site visit.
Common questions
How thick should a concrete driveway be?
Four inches is the minimum for passenger cars. Five inches is common in the Pittsburgh area and is what our estimates assume, because it holds up better to freeze-thaw cycles and heavier vehicles. Six inches or rebar is worth it for trucks, RVs or soft ground.
Do I need a permit for a new concrete driveway?
Often, yes, especially if the work touches the curb, apron or public right-of-way. Requirements are set by each borough and township, so check with yours before work starts. Your contractor usually pulls the permit.
How long before I can drive on new concrete?
You can usually walk on it after one to two days and drive a car on it after about seven days. Concrete reaches its design strength at about 28 days, so wait that long for heavy trucks.
When is the best time to pour a driveway in Pennsylvania?
Spring through fall. Pours below about 40°F need blankets or heated mix, which adds cost, and many contractors stop pouring in the coldest months.